PST Group AB has signed a EUR 42 million (incl. VAT) contract with UAB JPresswood for the construction of a complex of industrial buildings in Marijampolė, with the necessary ancillary and energy production buildings, an administrative building with domestic premises and all the necessary engineering infrastructure.
The buildings will have a total area of around 20,000 sq. m and the estimated timeframe for completion of the works is 2 years.
The main buildings are designed to be energy efficient class A++. Also the outdoor engineering networks and infrastructure necessary for the functioning of the buildings will be installed, i.e. access roads, parking lots, etc.
More information:
Tomas Stukas
Managing Director
Tel.: +370 618 21360
- Zraox Launches Green Blockchain and Philanthropy Strategy to Promote Social and Environmental Wins in the Digital Asset Industry - May 22, 2025
- Matachewan Announces Purchase andSale Agreement to Mineral Royalties - May 22, 2025
- SEALCOIN Unveils Major Milestones: From Satellite-Powered IoT Transactions to Launch of Marketing Campaign Ahead of Token Sale - May 22, 2025